Run details
Run name | R-5 |
Date range | 25 Feb 2020 09:00 ÷ 1 Mar 2020 15:50 |
1st detector diameter | 2 µm (aperture) |
2nd detector diameter | 200 µm |
Avg. wavepacket spread | ~13 µm |
Number of cycles | 218 |
Number of measurements | 577 676 |
Total time of measurements | 80 hours 14 minutes |
Mean transmittance quotient | 100.30 ±0.18 % |
Mean transmittance difference | 0.30 ±0.18 % |
Previous run (R-3) | All runs (Up) | Next run (R-6) |
Measuring cycles plots
Fig.1 Measured values & standard error
Mean transmittance quotients along with their 1σ standard errors for the individual cycles and the bands showing the accumulated 1σ and 5σ measurement uncertainties (standard error). Both total and partial pressure readings are superimposed. X-axis: cycle number.
Fig.2 Cycles timeline & pressure
Mean transmittance quotients along with their 1σ standard errors for the individual cycles. Both total and partial pressure readings are superimposed. X-axis: timeline.
Measuring cycles table
Previous run (R-3) | All runs (Up) | Next run (R-6) |